Thesis Open Access
Misgana Aragaw Mekuria
{ "description": "<p>The main purpose of the study was to identify and evaluate the challenges encountered<br>\nthrough project management practices in Ethiopian Airports Infrastructure development<br>\nprojects. The study aims to point out these difficulties and thus improve the project<br>\nmanagement practice in order to benefit from the findings. A descriptive research method<br>\nwas used in order to achieve the intended purpose of the study. Questionnaire, interview and<br>\nreview were used for the purpose of collecting required data for the study. The Questionnaire<br>\nsurvey were collected from the Ethiopian Airport employees who are directly involved in<br>\ninfrastructure development project planning, Executing and controlling. Purposive sampling<br>\ntechnique was employed in selecting the samples. The data were analyzed using software<br>\nStatistical Package for Social Science (SPSS V.20) to generate mean, frequencies, standard<br>\ndeviation and percentages of the statics. The study found out that among 45 challenging<br>\nfactors identified in the literature participants are agreed on 18 factors as a significant<br>\nchallenge in projects they have been involved recently. Again ten of the identified factors are<br>\nthe major significant challenging factors these are; These are Lack of Project Management<br>\nSkills and training in project management; Unexpected events with no effective response<br>\npossible; Project schedule delays; Changing requirements late in the project and continuing<br>\nchange requests; Low commitment of Stakeholders towards planned projects;</p>", "license": "http://www.opendefinition.org/licenses/cc-by", "creator": [ { "@type": "Person", "name": "Misgana Aragaw Mekuria" } ], "headline": "CHALLENGES OF PROJECT MANAGEMENT PRACTICE IN ETHIOPIAN AIRPORTS INFRASTRUCTURE DEVELOPMENT PROJECTS", "image": "https://zenodo.org/static/img/logos/zenodo-gradient-round.svg", "datePublished": "2019-09-01", "url": "https://nadre.ethernet.edu.et/record/4368", "@context": "https://schema.org/", "identifier": "https://doi.org/10.20372/nadre:4368", "@id": "https://doi.org/10.20372/nadre:4368", "@type": "ScholarlyArticle", "name": "CHALLENGES OF PROJECT MANAGEMENT PRACTICE IN ETHIOPIAN AIRPORTS INFRASTRUCTURE DEVELOPMENT PROJECTS" }
All versions | This version | |
---|---|---|
Views | 0 | 0 |
Downloads | 0 | 0 |
Data volume | 0 Bytes | 0 Bytes |
Unique views | 0 | 0 |
Unique downloads | 0 | 0 |