Thesis Open Access
Misgana Aragaw Mekuria
{
"files": [
{
"links": {
"self": "https://nadre.ethernet.edu.et/api/files/542324c0-2085-427c-b025-e9e39e3077cd/f1042664640.pdf"
},
"checksum": "md5:d45cbd5fd89e1d88df48cadeabb670f7",
"bucket": "542324c0-2085-427c-b025-e9e39e3077cd",
"key": "f1042664640.pdf",
"type": "pdf",
"size": 647925
}
],
"owners": [
11
],
"doi": "10.20372/nadre:4368",
"stats": {},
"links": {
"doi": "https://doi.org/10.20372/nadre:4368",
"conceptdoi": "https://doi.org/10.20372/nadre:4367",
"bucket": "https://nadre.ethernet.edu.et/api/files/542324c0-2085-427c-b025-e9e39e3077cd",
"conceptbadge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4367.svg",
"html": "https://nadre.ethernet.edu.et/record/4368",
"latest_html": "https://nadre.ethernet.edu.et/record/4368",
"badge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4368.svg",
"latest": "https://nadre.ethernet.edu.et/api/records/4368"
},
"conceptdoi": "10.20372/nadre:4367",
"created": "2024-11-29T12:36:48.123857+00:00",
"updated": "2024-11-29T12:36:50.330195+00:00",
"conceptrecid": "4367",
"revision": 3,
"id": 4368,
"metadata": {
"access_right_category": "success",
"doi": "10.20372/nadre:4368",
"description": "<p>The main purpose of the study was to identify and evaluate the challenges encountered<br>\nthrough project management practices in Ethiopian Airports Infrastructure development<br>\nprojects. The study aims to point out these difficulties and thus improve the project<br>\nmanagement practice in order to benefit from the findings. A descriptive research method<br>\nwas used in order to achieve the intended purpose of the study. Questionnaire, interview and<br>\nreview were used for the purpose of collecting required data for the study. The Questionnaire<br>\nsurvey were collected from the Ethiopian Airport employees who are directly involved in<br>\ninfrastructure development project planning, Executing and controlling. Purposive sampling<br>\ntechnique was employed in selecting the samples. The data were analyzed using software<br>\nStatistical Package for Social Science (SPSS V.20) to generate mean, frequencies, standard<br>\ndeviation and percentages of the statics. The study found out that among 45 challenging<br>\nfactors identified in the literature participants are agreed on 18 factors as a significant<br>\nchallenge in projects they have been involved recently. Again ten of the identified factors are<br>\nthe major significant challenging factors these are; These are Lack of Project Management<br>\nSkills and training in project management; Unexpected events with no effective response<br>\npossible; Project schedule delays; Changing requirements late in the project and continuing<br>\nchange requests; Low commitment of Stakeholders towards planned projects;</p>",
"license": {
"id": "cc-by"
},
"title": "CHALLENGES OF PROJECT MANAGEMENT PRACTICE IN ETHIOPIAN AIRPORTS INFRASTRUCTURE DEVELOPMENT PROJECTS",
"relations": {
"version": [
{
"count": 1,
"index": 0,
"parent": {
"pid_type": "recid",
"pid_value": "4367"
},
"is_last": true,
"last_child": {
"pid_type": "recid",
"pid_value": "4368"
}
}
]
},
"communities": [
{
"id": "aau"
},
{
"id": "zenodo"
}
],
"publication_date": "2019-09-01",
"creators": [
{
"name": "Misgana Aragaw Mekuria"
}
],
"access_right": "open",
"resource_type": {
"subtype": "thesis",
"type": "publication",
"title": "Thesis"
},
"related_identifiers": [
{
"scheme": "doi",
"identifier": "10.20372/nadre:4367",
"relation": "isVersionOf"
}
]
}
}
| All versions | This version | |
|---|---|---|
| Views | 0 | 0 |
| Downloads | 0 | 0 |
| Data volume | 0 Bytes | 0 Bytes |
| Unique views | 0 | 0 |
| Unique downloads | 0 | 0 |