Thesis Open Access
Misgana Aragaw Mekuria
{ "files": [ { "links": { "self": "https://nadre.ethernet.edu.et/api/files/542324c0-2085-427c-b025-e9e39e3077cd/f1042664640.pdf" }, "checksum": "md5:d45cbd5fd89e1d88df48cadeabb670f7", "bucket": "542324c0-2085-427c-b025-e9e39e3077cd", "key": "f1042664640.pdf", "type": "pdf", "size": 647925 } ], "owners": [ 11 ], "doi": "10.20372/nadre:4368", "stats": {}, "links": { "doi": "https://doi.org/10.20372/nadre:4368", "conceptdoi": "https://doi.org/10.20372/nadre:4367", "bucket": "https://nadre.ethernet.edu.et/api/files/542324c0-2085-427c-b025-e9e39e3077cd", "conceptbadge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4367.svg", "html": "https://nadre.ethernet.edu.et/record/4368", "latest_html": "https://nadre.ethernet.edu.et/record/4368", "badge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4368.svg", "latest": "https://nadre.ethernet.edu.et/api/records/4368" }, "conceptdoi": "10.20372/nadre:4367", "created": "2024-11-29T12:36:48.123857+00:00", "updated": "2024-11-29T12:36:50.330195+00:00", "conceptrecid": "4367", "revision": 3, "id": 4368, "metadata": { "access_right_category": "success", "doi": "10.20372/nadre:4368", "description": "<p>The main purpose of the study was to identify and evaluate the challenges encountered<br>\nthrough project management practices in Ethiopian Airports Infrastructure development<br>\nprojects. The study aims to point out these difficulties and thus improve the project<br>\nmanagement practice in order to benefit from the findings. A descriptive research method<br>\nwas used in order to achieve the intended purpose of the study. Questionnaire, interview and<br>\nreview were used for the purpose of collecting required data for the study. The Questionnaire<br>\nsurvey were collected from the Ethiopian Airport employees who are directly involved in<br>\ninfrastructure development project planning, Executing and controlling. Purposive sampling<br>\ntechnique was employed in selecting the samples. The data were analyzed using software<br>\nStatistical Package for Social Science (SPSS V.20) to generate mean, frequencies, standard<br>\ndeviation and percentages of the statics. The study found out that among 45 challenging<br>\nfactors identified in the literature participants are agreed on 18 factors as a significant<br>\nchallenge in projects they have been involved recently. Again ten of the identified factors are<br>\nthe major significant challenging factors these are; These are Lack of Project Management<br>\nSkills and training in project management; Unexpected events with no effective response<br>\npossible; Project schedule delays; Changing requirements late in the project and continuing<br>\nchange requests; Low commitment of Stakeholders towards planned projects;</p>", "license": { "id": "cc-by" }, "title": "CHALLENGES OF PROJECT MANAGEMENT PRACTICE IN ETHIOPIAN AIRPORTS INFRASTRUCTURE DEVELOPMENT PROJECTS", "relations": { "version": [ { "count": 1, "index": 0, "parent": { "pid_type": "recid", "pid_value": "4367" }, "is_last": true, "last_child": { "pid_type": "recid", "pid_value": "4368" } } ] }, "communities": [ { "id": "aau" }, { "id": "zenodo" } ], "publication_date": "2019-09-01", "creators": [ { "name": "Misgana Aragaw Mekuria" } ], "access_right": "open", "resource_type": { "subtype": "thesis", "type": "publication", "title": "Thesis" }, "related_identifiers": [ { "scheme": "doi", "identifier": "10.20372/nadre:4367", "relation": "isVersionOf" } ] } }
All versions | This version | |
---|---|---|
Views | 0 | 0 |
Downloads | 0 | 0 |
Data volume | 0 Bytes | 0 Bytes |
Unique views | 0 | 0 |
Unique downloads | 0 | 0 |