Assessment of Railway Tunneling by Cut and Cover Method - Case study of the St. George Church Tunnel in Addis Ababa

MAMMO MUMICHA


MARC21 XML Export

<?xml version='1.0' encoding='UTF-8'?>
<record xmlns="http://www.loc.gov/MARC21/slim">
  <leader>00000nam##2200000uu#4500</leader>
  <controlfield tag="005">20240923135216.0</controlfield>
  <controlfield tag="001">2331</controlfield>
  <datafield tag="856" ind1="4" ind2=" ">
    <subfield code="s">7891360</subfield>
    <subfield code="z">md5:14a7204851f8cee4b713133c66a889ab</subfield>
    <subfield code="u">https://zenodo.org/record/2331/files/f1047863000.pdf</subfield>
  </datafield>
  <datafield tag="542" ind1=" " ind2=" ">
    <subfield code="l">open</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="c">2016-03-01</subfield>
  </datafield>
  <datafield tag="909" ind1="C" ind2="O">
    <subfield code="p">user-aau</subfield>
    <subfield code="p">user-zenodo</subfield>
    <subfield code="o">oai:zenodo.org:2331</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">MAMMO MUMICHA</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Assessment of Railway Tunneling by Cut and Cover Method - Case study of the St. George Church Tunnel in Addis Ababa</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-aau</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-zenodo</subfield>
  </datafield>
  <datafield tag="540" ind1=" " ind2=" ">
    <subfield code="u">http://www.opendefinition.org/licenses/cc-by</subfield>
    <subfield code="a">Creative Commons Attribution</subfield>
  </datafield>
  <datafield tag="650" ind1="1" ind2="7">
    <subfield code="a">cc-by</subfield>
    <subfield code="2">opendefinition.org</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">&lt;p&gt;The aim of this work is to assess the construction method and used in tunnel -1 construction site for given site soil condition. It is known that the cut and cover tunnel-1 alignment is under urban street and it needs a serious consideration to provided street for services after excavation; and also the construction method should have to secured the worker and society around the site construction during construction time. In addition, construction method should safe with respect to environmental &amp;amp;socio-economical of Ethiopian. Finally, the construction method of the tunnel-1constructed by cut and cover is tested and assessed by literatures analysis. The construction method will addressed per global class trend and which applicable for Ethiopia depend on site investigation data&lt;/p&gt;</subfield>
  </datafield>
  <datafield tag="773" ind1=" " ind2=" ">
    <subfield code="n">doi</subfield>
    <subfield code="i">isVersionOf</subfield>
    <subfield code="a">10.20372/nadre:2330</subfield>
  </datafield>
  <datafield tag="024" ind1=" " ind2=" ">
    <subfield code="a">10.20372/nadre:2331</subfield>
    <subfield code="2">doi</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">publication</subfield>
    <subfield code="b">thesis</subfield>
  </datafield>
</record>
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as