Thesis Open Access

Assessment of Railway Tunneling by Cut and Cover Method - Case study of the St. George Church Tunnel in Addis Ababa

MAMMO MUMICHA

The aim of this work is to assess the construction method and used in tunnel -1 construction site for given site soil condition. It is known that the cut and cover tunnel-1 alignment is under urban street and it needs a serious consideration to provided street for services after excavation; and also the construction method should have to secured the worker and society around the site construction during construction time. In addition, construction method should safe with respect to environmental &socio-economical of Ethiopian. Finally, the construction method of the tunnel-1constructed by cut and cover is tested and assessed by literatures analysis. The construction method will addressed per global class trend and which applicable for Ethiopia depend on site investigation data

Files (7.9 MB)
Name Size
f1047863000.pdf
md5:14a7204851f8cee4b713133c66a889ab
7.9 MB Download
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as