Thesis Open Access
MAMMO MUMICHA
The aim of this work is to assess the construction method and used in tunnel -1 construction site for given site soil condition. It is known that the cut and cover tunnel-1 alignment is under urban street and it needs a serious consideration to provided street for services after excavation; and also the construction method should have to secured the worker and society around the site construction during construction time. In addition, construction method should safe with respect to environmental &socio-economical of Ethiopian. Finally, the construction method of the tunnel-1constructed by cut and cover is tested and assessed by literatures analysis. The construction method will addressed per global class trend and which applicable for Ethiopia depend on site investigation data
Name | Size | |
---|---|---|
f1047863000.pdf
md5:14a7204851f8cee4b713133c66a889ab |
7.9 MB | Download |
All versions | This version | |
---|---|---|
Views | 0 | 0 |
Downloads | 0 | 0 |
Data volume | 0 Bytes | 0 Bytes |
Unique views | 0 | 0 |
Unique downloads | 0 | 0 |