Thesis Open Access
TEKLU BEKELE
{
"files": [
{
"links": {
"self": "https://nadre.ethernet.edu.et/api/files/ab0c0247-6f00-4b37-b740-69817e794ca4/f1042664640.pdf"
},
"checksum": "md5:d45cbd5fd89e1d88df48cadeabb670f7",
"bucket": "ab0c0247-6f00-4b37-b740-69817e794ca4",
"key": "f1042664640.pdf",
"type": "pdf",
"size": 647925
}
],
"owners": [
11
],
"doi": "10.20372/nadre:4810",
"stats": {},
"links": {
"doi": "https://doi.org/10.20372/nadre:4810",
"conceptdoi": "https://doi.org/10.20372/nadre:4809",
"bucket": "https://nadre.ethernet.edu.et/api/files/ab0c0247-6f00-4b37-b740-69817e794ca4",
"conceptbadge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4809.svg",
"html": "https://nadre.ethernet.edu.et/record/4810",
"latest_html": "https://nadre.ethernet.edu.et/record/4810",
"badge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A4810.svg",
"latest": "https://nadre.ethernet.edu.et/api/records/4810"
},
"conceptdoi": "10.20372/nadre:4809",
"created": "2024-12-04T12:31:21.243873+00:00",
"updated": "2024-12-04T12:31:23.422948+00:00",
"conceptrecid": "4809",
"revision": 3,
"id": 4810,
"metadata": {
"access_right_category": "success",
"doi": "10.20372/nadre:4810",
"description": "<p>This research deals with the performance assessment and upgrading of Walga micro hydro<br>\npower plant owned by government and fitted with cross flow turbine. Walga site is located in<br>\nOromia Regional State, South West Shoa zone, Wonchi Woreda Azer_Keransa Kebele. Walga<br>\nsite is located in a remote area. Currently, even though the village has the opportunity to get<br>\npower from micro hydro power plant that was installed in 2014 by the Ministry of Water,<br>\nIrrigation and Electricity, still the plant lacks reliability, sustainability and safety problems. The<br>\nkey reasons for the performance assessment and up grading of the existing Walga micro hydro<br>\npower station were to know the efficiencies (turbine and unit efficiencies) and to determine the<br>\nelectrical power output of the plant. And also to know the power demand gap between supply<br>\nside from the existing micro hydro power generator and demand side obtained from the village<br>\npower demand assessment during the field survey. Therefore, performance assessment and<br>\ntesting, power need assessment of the community, determination of the power gap between the<br>\nsupply side from the existing Walga micro hydro power station and demand side were the<br>\npurpose of this thesis work.<br>\nIn this study, performance assessment of existing Walga micro hydro power station was carried<br>\nout and performance indicators were identified. Based on the performance test results and the<br>\nvillage power demand assessment findings, the power demand gap of Walga village was known.,<br>\nTwo options were proposed to meet the power demand gap of the village. The first option is<br>\ndeveloping a PV/micro hydro hybrid power supply system and the second option is developing<br>\nmicro hydro resource existing at the site</p>",
"license": {
"id": "cc-by"
},
"title": "PERFORMANCE ASSESSMENT AND UPGRADING OF WALGA MICRO-HYDRO POWER STATION",
"relations": {
"version": [
{
"count": 1,
"index": 0,
"parent": {
"pid_type": "recid",
"pid_value": "4809"
},
"is_last": true,
"last_child": {
"pid_type": "recid",
"pid_value": "4810"
}
}
]
},
"communities": [
{
"id": "aau"
},
{
"id": "zenodo"
}
],
"publication_date": "2017-07-01",
"creators": [
{
"name": "TEKLU BEKELE"
}
],
"access_right": "open",
"resource_type": {
"subtype": "thesis",
"type": "publication",
"title": "Thesis"
},
"related_identifiers": [
{
"scheme": "doi",
"identifier": "10.20372/nadre:4809",
"relation": "isVersionOf"
}
]
}
}
| All versions | This version | |
|---|---|---|
| Views | 0 | 0 |
| Downloads | 0 | 0 |
| Data volume | 0 Bytes | 0 Bytes |
| Unique views | 0 | 0 |
| Unique downloads | 0 | 0 |