Thesis Open Access
TEKLU BEKELE
<?xml version='1.0' encoding='utf-8'?>
<resource xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://datacite.org/schema/kernel-4" xsi:schemaLocation="http://datacite.org/schema/kernel-4 http://schema.datacite.org/meta/kernel-4.1/metadata.xsd">
<identifier identifierType="DOI">10.20372/nadre:4810</identifier>
<creators>
<creator>
<creatorName>TEKLU BEKELE</creatorName>
</creator>
</creators>
<titles>
<title>PERFORMANCE ASSESSMENT AND UPGRADING OF WALGA MICRO-HYDRO POWER STATION</title>
</titles>
<publisher>Zenodo</publisher>
<publicationYear>2017</publicationYear>
<dates>
<date dateType="Issued">2017-07-01</date>
</dates>
<resourceType resourceTypeGeneral="Text">Thesis</resourceType>
<alternateIdentifiers>
<alternateIdentifier alternateIdentifierType="url">https://nadre.ethernet.edu.et/record/4810</alternateIdentifier>
</alternateIdentifiers>
<relatedIdentifiers>
<relatedIdentifier relatedIdentifierType="DOI" relationType="IsVersionOf">10.20372/nadre:4809</relatedIdentifier>
<relatedIdentifier relatedIdentifierType="URL" relationType="IsPartOf">https://nadre.ethernet.edu.et/communities/aau</relatedIdentifier>
<relatedIdentifier relatedIdentifierType="URL" relationType="IsPartOf">https://nadre.ethernet.edu.et/communities/zenodo</relatedIdentifier>
</relatedIdentifiers>
<rightsList>
<rights rightsURI="http://www.opendefinition.org/licenses/cc-by">Creative Commons Attribution</rights>
<rights rightsURI="info:eu-repo/semantics/openAccess">Open Access</rights>
</rightsList>
<descriptions>
<description descriptionType="Abstract"><p>This research deals with the performance assessment and upgrading of Walga micro hydro<br>
power plant owned by government and fitted with cross flow turbine. Walga site is located in<br>
Oromia Regional State, South West Shoa zone, Wonchi Woreda Azer_Keransa Kebele. Walga<br>
site is located in a remote area. Currently, even though the village has the opportunity to get<br>
power from micro hydro power plant that was installed in 2014 by the Ministry of Water,<br>
Irrigation and Electricity, still the plant lacks reliability, sustainability and safety problems. The<br>
key reasons for the performance assessment and up grading of the existing Walga micro hydro<br>
power station were to know the efficiencies (turbine and unit efficiencies) and to determine the<br>
electrical power output of the plant. And also to know the power demand gap between supply<br>
side from the existing micro hydro power generator and demand side obtained from the village<br>
power demand assessment during the field survey. Therefore, performance assessment and<br>
testing, power need assessment of the community, determination of the power gap between the<br>
supply side from the existing Walga micro hydro power station and demand side were the<br>
purpose of this thesis work.<br>
In this study, performance assessment of existing Walga micro hydro power station was carried<br>
out and performance indicators were identified. Based on the performance test results and the<br>
village power demand assessment findings, the power demand gap of Walga village was known.,<br>
Two options were proposed to meet the power demand gap of the village. The first option is<br>
developing a PV/micro hydro hybrid power supply system and the second option is developing<br>
micro hydro resource existing at the site</p></description>
</descriptions>
</resource>
| All versions | This version | |
|---|---|---|
| Views | 0 | 0 |
| Downloads | 0 | 0 |
| Data volume | 0 Bytes | 0 Bytes |
| Unique views | 0 | 0 |
| Unique downloads | 0 | 0 |