Thesis Open Access

PERFORMANCE ASSESSMENT AND UPGRADING OF WALGA MICRO-HYDRO POWER STATION

TEKLU BEKELE


DataCite XML Export

<?xml version='1.0' encoding='utf-8'?>
<resource xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://datacite.org/schema/kernel-4" xsi:schemaLocation="http://datacite.org/schema/kernel-4 http://schema.datacite.org/meta/kernel-4.1/metadata.xsd">
  <identifier identifierType="DOI">10.20372/nadre:4810</identifier>
  <creators>
    <creator>
      <creatorName>TEKLU BEKELE</creatorName>
    </creator>
  </creators>
  <titles>
    <title>PERFORMANCE ASSESSMENT AND UPGRADING OF WALGA MICRO-HYDRO POWER STATION</title>
  </titles>
  <publisher>Zenodo</publisher>
  <publicationYear>2017</publicationYear>
  <dates>
    <date dateType="Issued">2017-07-01</date>
  </dates>
  <resourceType resourceTypeGeneral="Text">Thesis</resourceType>
  <alternateIdentifiers>
    <alternateIdentifier alternateIdentifierType="url">https://nadre.ethernet.edu.et/record/4810</alternateIdentifier>
  </alternateIdentifiers>
  <relatedIdentifiers>
    <relatedIdentifier relatedIdentifierType="DOI" relationType="IsVersionOf">10.20372/nadre:4809</relatedIdentifier>
    <relatedIdentifier relatedIdentifierType="URL" relationType="IsPartOf">https://nadre.ethernet.edu.et/communities/aau</relatedIdentifier>
    <relatedIdentifier relatedIdentifierType="URL" relationType="IsPartOf">https://nadre.ethernet.edu.et/communities/zenodo</relatedIdentifier>
  </relatedIdentifiers>
  <rightsList>
    <rights rightsURI="http://www.opendefinition.org/licenses/cc-by">Creative Commons Attribution</rights>
    <rights rightsURI="info:eu-repo/semantics/openAccess">Open Access</rights>
  </rightsList>
  <descriptions>
    <description descriptionType="Abstract">&lt;p&gt;This research deals with the performance assessment and upgrading of Walga micro hydro&lt;br&gt;
power plant owned by government and fitted with cross flow turbine. Walga site is located in&lt;br&gt;
Oromia Regional State, South West Shoa zone, Wonchi Woreda Azer_Keransa Kebele. Walga&lt;br&gt;
site is located in a remote area. Currently, even though the village has the opportunity to get&lt;br&gt;
power from micro hydro power plant that was installed in 2014 by the Ministry of Water,&lt;br&gt;
Irrigation and Electricity, still the plant lacks reliability, sustainability and safety problems. The&lt;br&gt;
key reasons for the performance assessment and up grading of the existing Walga micro hydro&lt;br&gt;
power station were to know the efficiencies (turbine and unit efficiencies) and to determine the&lt;br&gt;
electrical power output of the plant. And also to know the power demand gap between supply&lt;br&gt;
side from the existing micro hydro power generator and demand side obtained from the village&lt;br&gt;
power demand assessment during the field survey. Therefore, performance assessment and&lt;br&gt;
testing, power need assessment of the community, determination of the power gap between the&lt;br&gt;
supply side from the existing Walga micro hydro power station and demand side were the&lt;br&gt;
purpose of this thesis work.&lt;br&gt;
In this study, performance assessment of existing Walga micro hydro power station was carried&lt;br&gt;
out and performance indicators were identified. Based on the performance test results and the&lt;br&gt;
village power demand assessment findings, the power demand gap of Walga village was known.,&lt;br&gt;
Two options were proposed to meet the power demand gap of the village. The first option is&lt;br&gt;
developing a PV/micro hydro hybrid power supply system and the second option is developing&lt;br&gt;
micro hydro resource existing at the site&lt;/p&gt;</description>
  </descriptions>
</resource>
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as