Thesis Open Access

MAXIMIZE OPERATING ROOM CAPACITY BY INTERVENINIG AN AVOIDABLE CANCELATION AT ST .PETER SPRCIALIZED HOSPITAL

SAMUEL ASSEFA


Dublin Core Export

<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:creator>SAMUEL ASSEFA</dc:creator>
  <dc:date>2018-06-01</dc:date>
  <dc:description>Background: Elective surgical case cancellation refers to any elective surgical case that is booked
into the operation theatre list on the day prior to surgery, but is not operated upon as
scheduled. Elective surgical case cancellation is common and can have significant adverse effects.
The cancellation of planned surgeries causes prolonged wait times, harm to patients, and is a waste of
scarce resources. Reasons for cancellations are complex because they are related to patients,
organizational issues, and clinical staff.
Objective: -To Assess the frequency, to identify reasons for cancellation and to intervening
potentially avoidable causes of cancellation and observe the impacts of intervention made in St. peter
specialized hospital.
Methods: -The study took place at St. peter specialized hospital. This is a pre and post intervention
study from February1/2010 to May 30/2010 E.C. All adult patients that underwent elective surgery in
operation room with in the study period were including. Total number of cancellations as well as
cause of cancellation was noted.
Implementation: The most feasible intervention was addressing reasons of cancellation due to
shortage of OR material (Guan, cape, drape).
Result: -At Pre intervention period highly cancellation caused by shortage of surgical material (guan,
Cape &amp; drape). Plan was purchased each 100 of OR guan, drape &amp; cape. Now all are ready for work.
Conclusion: Cancellation of surgeries is significant problem in this hospital .Reasons for cancellation
identified was four categories. Whereas only one was selected for intervention in these study after
taking impact, feasibility, cost effectiveness, time constraints into consideration. The highest present
for reasons for cancellation were seen due to shortage of operation room material in pre-intervention
period.</dc:description>
  <dc:identifier>https://zenodo.org/record/4318</dc:identifier>
  <dc:identifier>10.20372/nadre:4318</dc:identifier>
  <dc:identifier>oai:zenodo.org:4318</dc:identifier>
  <dc:relation>doi:10.20372/nadre:4317</dc:relation>
  <dc:relation>url:https://nadre.ethernet.edu.et/communities/aau</dc:relation>
  <dc:relation>url:https://nadre.ethernet.edu.et/communities/zenodo</dc:relation>
  <dc:rights>info:eu-repo/semantics/openAccess</dc:rights>
  <dc:rights>http://www.opendefinition.org/licenses/cc-by</dc:rights>
  <dc:title>MAXIMIZE OPERATING ROOM CAPACITY BY INTERVENINIG AN AVOIDABLE  CANCELATION AT ST .PETER SPRCIALIZED HOSPITAL</dc:title>
  <dc:type>info:eu-repo/semantics/doctoralThesis</dc:type>
  <dc:type>publication-thesis</dc:type>
</oai_dc:dc>
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as