Thesis Open Access
FAYERA MOSISA
{
"DOI": "10.20372/nadre:2926",
"author": [
{
"family": "FAYERA MOSISA"
}
],
"issued": {
"date-parts": [
[
2016,
2,
1
]
]
},
"abstract": "<p>Speed Optimization is a means of improving the geometric alignment, infrastructure and<br>\nconstruction materials and structure performance during the working cycles under some manufacturing,<br>\noperational and failure conditions as well as cost limitations.<br>\nThe new Ethiopian national railway network design speed is about 120Km/h which is too low when<br>\ncompared with some developed countries rail speed. Construction of new high speed line needs huge<br>\ninvestment that may not be viable for a developing country like Ethiopia and optimization of existing line<br>\nusing different techniques is the available option. The major anticipated problems/demand behind for<br>\nhigh speed for the country national rail network and Addis Ababa – Adama line in particular are for that<br>\nit is Competitive with toll road of same speed, located along the development axis area of Ethiopian<br>\neconomy, located along country’s industrial zone highly polluted by industry emission, national image<br>\nbuilding, attracting investor and delay of freight at sea port.<br>\nOptimization of speed were done by enquiring and analyzing existing track geometry and track super<br>\nstructures, construction materials and other speed related parameters to identify restrictive sections and<br>\nthe maximum allowable speed of the line. Geometric analysis and design were done by Bentley Inrail<br>\nsoftware in the optimization process and finite element methods were used for analyzing of track<br>\ncomponent response under optimized speed</p>",
"title": "TRACK SURVEYING AND SPEED OPTIMIZATION (CASE STUDY ADDIS ABABA \u2013 ADAMA LINE)",
"type": "thesis",
"id": "2926"
}
| All versions | This version | |
|---|---|---|
| Views | 0 | 0 |
| Downloads | 0 | 0 |
| Data volume | 0 Bytes | 0 Bytes |
| Unique views | 0 | 0 |
| Unique downloads | 0 | 0 |