Thesis Open Access

ASSESSMENT OF PROJECT RISK MANAGEMENT PRACTICE OF IT PROJECT: THE CASE OF ETHIO TELECOM

REDIAT MEKONNEN


MARC21 XML Export

<?xml version='1.0' encoding='UTF-8'?>
<record xmlns="http://www.loc.gov/MARC21/slim">
  <leader>00000nam##2200000uu#4500</leader>
  <controlfield tag="005">20240920105900.0</controlfield>
  <controlfield tag="001">2059</controlfield>
  <datafield tag="856" ind1="4" ind2=" ">
    <subfield code="s">1284137</subfield>
    <subfield code="z">md5:d0d55a441c3553dc17470b27a09ff8ca</subfield>
    <subfield code="u">https://zenodo.org/record/2059/files/f1047052224.pdf</subfield>
  </datafield>
  <datafield tag="542" ind1=" " ind2=" ">
    <subfield code="l">open</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="c">2019-07-01</subfield>
  </datafield>
  <datafield tag="909" ind1="C" ind2="O">
    <subfield code="p">user-zenodo</subfield>
    <subfield code="p">user-aau</subfield>
    <subfield code="o">oai:zenodo.org:2059</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">REDIAT MEKONNEN</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">ASSESSMENT OF PROJECT RISK MANAGEMENT PRACTICE OF IT PROJECT: THE CASE OF ETHIO TELECOM</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-aau</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-zenodo</subfield>
  </datafield>
  <datafield tag="540" ind1=" " ind2=" ">
    <subfield code="u">http://www.opendefinition.org/licenses/cc-by</subfield>
    <subfield code="a">Creative Commons Attribution</subfield>
  </datafield>
  <datafield tag="650" ind1="1" ind2="7">
    <subfield code="a">cc-by</subfield>
    <subfield code="2">opendefinition.org</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">&lt;p&gt;This study is targeted to assess project risk practice of IT project in Ethio Telecom by addressing the process undergone namely: risk planning, risk identification, risk analysis, risk response, and risk monitoring and controlling. The primary data was collected from 60 respondents out of the total population of 387 which are selected using non-probability purposive sampling. And the collected data analyzed using SPSS version 20.0. Then the data presented quantitatively using descriptive statistics. Semi-structured interview was also conducted with 4 project managers, and analyzed qualitatively by integrating secondary data obtained from TEP chart, reports, magazines, And Ethio telecom booklet. The findings obtained about the practice of risk planning revealed that the project have a systematic risk planning process and it is prepared with the involvement of relevant stakeholders and consideration of an expert judgment. However, team members do not receive training about how to handle risks. Regarding the practice of risk identification, there is no involvement of all team members; the project uses a measurement system to analyze risk and subjective probability assessment to assess the probability of risk occurrence&lt;/p&gt;</subfield>
  </datafield>
  <datafield tag="773" ind1=" " ind2=" ">
    <subfield code="n">doi</subfield>
    <subfield code="i">isVersionOf</subfield>
    <subfield code="a">10.20372/nadre:2058</subfield>
  </datafield>
  <datafield tag="024" ind1=" " ind2=" ">
    <subfield code="a">10.20372/nadre:2059</subfield>
    <subfield code="2">doi</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">publication</subfield>
    <subfield code="b">thesis</subfield>
  </datafield>
</record>
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as