Thesis Open Access

PRACTICES & CHALLENGES OF STAKEHOLDER MANAGEMENT: THE CASE OF ADDIS ABABA HOUSING CONSTRUCTION PROJECT AT "AKAKI-KALITY" PROJECT SITE

Aklile Tesfaye Eshete

This study aims to identify roles of stakeholders who have definable influence on the delivery of Housing construction project at “Akaki-kality” project site. Four specific objectives were set accordingly: to identify the types, responsibilities and interests of different stakeholders’ during construction of Addis Ababa Housing construction project; to identify the most common factors affecting the stakeholder management process in the construction project; to investigate the challenges associated with managing various stakeholder expectations and influences; and to assess the effectiveness of stakeholder management. A literature reviews on the topic related to the stakeholder management was conducted. The research used descriptive research design and a mixed method of qualitative and quantitative approaches. The study also used both primary and secondary data sources. A questionnaire survey was carried out among selected project participants in the construction project site

Files (2.9 MB)
Name Size
f1045794952.pdf
md5:8b571ce2c74a8ce30cd2dfdf42a5a922
2.9 MB Download
0
0
views
downloads
All versions This version
Views 00
Downloads 00
Data volume 0 Bytes0 Bytes
Unique views 00
Unique downloads 00

Share

Cite as