Thesis Open Access
Dereje Bitew
{ "files": [ { "links": { "self": "https://nadre.ethernet.edu.et/api/files/a611d4b0-a622-48ef-af82-933e82c438e0/f1042664640.pdf" }, "checksum": "md5:d45cbd5fd89e1d88df48cadeabb670f7", "bucket": "a611d4b0-a622-48ef-af82-933e82c438e0", "key": "f1042664640.pdf", "type": "pdf", "size": 647925 } ], "owners": [ 11 ], "doi": "10.20372/nadre:5192", "stats": {}, "links": { "doi": "https://doi.org/10.20372/nadre:5192", "conceptdoi": "https://doi.org/10.20372/nadre:5191", "bucket": "https://nadre.ethernet.edu.et/api/files/a611d4b0-a622-48ef-af82-933e82c438e0", "conceptbadge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A5191.svg", "html": "https://nadre.ethernet.edu.et/record/5192", "latest_html": "https://nadre.ethernet.edu.et/record/5192", "badge": "https://nadre.ethernet.edu.et/badge/doi/10.20372/nadre%3A5192.svg", "latest": "https://nadre.ethernet.edu.et/api/records/5192" }, "conceptdoi": "10.20372/nadre:5191", "created": "2024-12-20T13:43:08.754624+00:00", "updated": "2024-12-20T13:43:12.388234+00:00", "conceptrecid": "5191", "revision": 3, "id": 5192, "metadata": { "access_right_category": "success", "doi": "10.20372/nadre:5192", "description": "<p>This study was mainly set out with a general purpose to assess the quality management<br>\npractices and major quality management challenges in road construction projects at AACRA.<br>\nTo achieve its objective, the study employed both descriptive and explanatory research and<br>\nboth primary and secondary data were used. Questionnaires, interview, and document review<br>\nwere, therefore, used as data collection tools. Furthermore, it employed purposive sampling<br>\ntechniques to draw its samples. The survey questionnaire was designed based on the<br>\nliterature and on the information collected through the document review of the project.<br>\nThe survey questionnaire was distributed to 60 project implementation team members who<br>\nwere selected purposively among them 55 respondents were responded, which represented a<br>\nresponse rate of 91.67%. The data gathered through the questionnaire was analyzed by<br>\nStatistical Package for Social Science (SPSS). The generated data was analyzed using tables,<br>\nfrequency, percentage, and multiple regression approaches. The result of the study indicated<br>\nthat AACRA does not employ all stages of quality management process, tools and techniques.<br>\nSince they use only Inspection are found to be the major quality management tools and<br>\ntechniques used to control quality of project. Qualified and experiences personnel, top<br>\nmanagement support, communication with stakeholders, quality of materials and equipments<br>\nused in the project construction and conformance to specification are identified as the<br>\ntop factors in the determinant of the quality of road construction projects</p>", "license": { "id": "cc-by" }, "title": "Assessment of Quality management practices in construction projects: the case of AACRA", "relations": { "version": [ { "count": 1, "index": 0, "parent": { "pid_type": "recid", "pid_value": "5191" }, "is_last": true, "last_child": { "pid_type": "recid", "pid_value": "5192" } } ] }, "communities": [ { "id": "aau" }, { "id": "zenodo" } ], "publication_date": "2019-06-01", "creators": [ { "name": "Dereje Bitew" } ], "access_right": "open", "resource_type": { "subtype": "thesis", "type": "publication", "title": "Thesis" }, "related_identifiers": [ { "scheme": "doi", "identifier": "10.20372/nadre:5191", "relation": "isVersionOf" } ] } }
All versions | This version | |
---|---|---|
Views | 0 | 0 |
Downloads | 0 | 0 |
Data volume | 0 Bytes | 0 Bytes |
Unique views | 0 | 0 |
Unique downloads | 0 | 0 |