Thesis Open Access

Ethiopia's Construction Sector were faced challenges of delay, which is one of the most common problems of construction projects performance. In order to minimize delays, one should only have been recognized their causes through serious investigations and need to take correction actions timely for successful performance of the projects. Delay of Projects can be due to a number of causing reasons which included to groups of the client, the contractor, the consultant, or external factors. As per desk review study conducted on Oromia Regional Health Bureau (ORHB) hospital project's, the magnitude of delay was up to 396% of the contract time, which indicated that delay was a serious challenge to the performance of the bureau's projects. The aim of the research was to identify key delay causing factors and their impacts as the case of ORHB hospitals construction projects and forwarded possible conclusions and recommendations based on the findings of the results. After an intensive literature and desk reviews mostly related to the field of factors and impacts of delay; a questionnaire survey was conducted to find the perception of major parties participating in the performance of the construction projects in the region. Accordingly, 60 major causes of delay which categorized into four groups and 20 impacts of delay were identified.

Endale Engida


BibTeX Export

@misc{endale_engida_1999_4286,
  author       = {Endale Engida},
  title        = {{Ethiopia's Construction Sector were faced 
                   challenges of delay, which is one of the most
                   common problems of construction projects
                   performance. In order to minimize delays, one
                   should only have been recognized their causes
                   through serious investigations and need to take
                   correction actions timely for successful
                   performance of the projects. Delay of Projects can
                   be due to a number of causing reasons which
                   included to groups of the client, the contractor,
                   the consultant, or external factors. As per desk
                   review study conducted on Oromia Regional Health
                   Bureau (ORHB) hospital project's, the magnitude of
                   delay was up to 396\% of the contract time, which
                   indicated that delay was a serious challenge to
                   the performance of the bureau's projects. The aim
                   of the research was to identify key delay causing
                   factors and their impacts as the case of ORHB
                   hospitals construction projects and forwarded
                   possible conclusions and recommendations based on
                   the findings of the results. After an intensive
                   literature and desk reviews mostly related to the
                   field of factors and impacts of delay; a
                   questionnaire survey was conducted to find the
                   perception of major parties participating in the
                   performance of the construction projects in the
                   region. Accordingly, 60 major causes of delay
                   which categorized into four groups and 20 impacts
                   of delay were identified.}},
  month        = dec,
  year         = 1999,
  publisher    = {National Academic Digital Repository of Ethiopia},
  doi          = {10.20372/nadre:4286},
  url          = {https://doi.org/10.20372/nadre:4286}
}