Thesis Open Access
Endale Engida
@misc{endale_engida_1999_4286,
author = {Endale Engida},
title = {{Ethiopia's Construction Sector were faced
challenges of delay, which is one of the most
common problems of construction projects
performance. In order to minimize delays, one
should only have been recognized their causes
through serious investigations and need to take
correction actions timely for successful
performance of the projects. Delay of Projects can
be due to a number of causing reasons which
included to groups of the client, the contractor,
the consultant, or external factors. As per desk
review study conducted on Oromia Regional Health
Bureau (ORHB) hospital project's, the magnitude of
delay was up to 396\% of the contract time, which
indicated that delay was a serious challenge to
the performance of the bureau's projects. The aim
of the research was to identify key delay causing
factors and their impacts as the case of ORHB
hospitals construction projects and forwarded
possible conclusions and recommendations based on
the findings of the results. After an intensive
literature and desk reviews mostly related to the
field of factors and impacts of delay; a
questionnaire survey was conducted to find the
perception of major parties participating in the
performance of the construction projects in the
region. Accordingly, 60 major causes of delay
which categorized into four groups and 20 impacts
of delay were identified.}},
month = dec,
year = 1999,
publisher = {National Academic Digital Repository of Ethiopia},
doi = {10.20372/nadre:4286},
url = {https://doi.org/10.20372/nadre:4286}
}
| All versions | This version | |
|---|---|---|
| Views | 0 | 0 |
| Downloads | 0 | 0 |
| Data volume | 0 Bytes | 0 Bytes |
| Unique views | 0 | 0 |
| Unique downloads | 0 | 0 |