This study was aimed to assess project planning practices and its effect on performance of
projects in East Bale Zone of Ginnir City. The research design was. Mixed research design is
applied to describe what the current project planning practice looks like in the study
organization. For data collection stratified sampling is applied. Both qualitative and
quantitative research approach; primary and secondary sources of data were applied. The
primary data needed for this purpose were collected using structured questionnaires and
secondary data was collected from published or unpublished annual report and journal
articles. The target population was 200 and 4 construction projects within the city. In this
study descriptive statistics such as mean, standard deviation, correlation, and analysis was
used through SPSS Version 25 software. The study findings indicated that majority of the
project planning processes were not performed Based on the study conducted the planning
practice of the study organization is poor when assessed based on the survey. The result of
the analysis shows that the general project planning practice of the study organization is
weak but the level of staff awareness regarding the presence of the project plan and project
planning scope/work division implementation is good. On the other hand the most widely
used project planning tools were work break down structure. The inferential statistics
analysis results indicated that project performance of in the city has positive relationship
with independent variable, project planning knowledge areas. The study also found that
projects planning was poorly carried out. The study recommends that project planning
knowledge is the core for project performance so that the project sectors should train and equip its employee working on project planning process 2