Construction Material Management Practices and Its impact on Project Delivery: The Case of Public Building Projects in Addis Ababa (Develop Pertinent Software)

Ermias Birke


MARC21 XML Export

<?xml version='1.0' encoding='UTF-8'?>
<record xmlns="http://www.loc.gov/MARC21/slim">
  <leader>00000nam##2200000uu#4500</leader>
  <controlfield tag="001">4379</controlfield>
  <datafield tag="653" ind1=" " ind2=" ">
    <subfield code="a">material management, project delivery, public building projects, process type, root causes, cost, and time.</subfield>
  </datafield>
  <datafield tag="024" ind1=" " ind2=" ">
    <subfield code="a">10.20372/nadre/4379</subfield>
    <subfield code="2">doi</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">&lt;p&gt;Construction material management is an essential factor that adversely affecting the&lt;br&gt;
performance of construction projects. This study was conducted with an objective of&lt;br&gt;
identifying construction material management practice and its effect on project delivery&lt;br&gt;
for public building projects in Addis Ababa. Based on the responsibility of managing&lt;br&gt;
construction materials, contractors were targeted as a study population. The study has&lt;br&gt;
targeted 40 contractors that are involved in public building projects those are currently&lt;br&gt;
under construction and used census as a sampling method. Intended data was collected&lt;br&gt;
through structured questionnaire and 38 questionnaires were responded and analyzed&lt;br&gt;
through both descriptive and explanatory methods by using a statistical software called&lt;br&gt;
SPSS 23. The study has identified the contractors are using three types of material&lt;br&gt;
management process i.e. the material is supplied based on the schedule on Bill of&lt;br&gt;
material, use warehouse to store the materials and search supplier for the materials&lt;br&gt;
when demanded. Among the three process types, type 1 is better in making the&lt;br&gt;
companies better performers in cost. In most of the projects multiple supplier is used&lt;br&gt;
for single material. Problems in material identification, planning, vendor selection,&lt;br&gt;
procurement and construction phase are root causes for ineffective material&lt;br&gt;
management. Construction project material management process type significantly&lt;br&gt;
affects the existence of cost overrun on the projects but does not affect the level of cost&lt;br&gt;
overrun. On the other hand, Construction material management process types do not&lt;br&gt;
affect the project time. Problems of material identification, planning, vendor selection,&lt;br&gt;
procurement and construction phase highly affect the cost overrun and time delay of&lt;br&gt;
the projects but effect of the vendor selection problems is lowest when compared to&lt;br&gt;
other problem categories. Majority of Contractors in public building projects in Addis&lt;br&gt;
Ababa are not using software to manage construction materials. To support&lt;br&gt;
construction material management, this study has developed pertinent software. The&lt;br&gt;
contractors are recommended to improve their construction material management&lt;br&gt;
practices and solve their material management problems by using the software.&lt;br&gt;
&amp;nbsp;&lt;/p&gt;</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2=" ">
    <subfield code="s">2183156</subfield>
    <subfield code="u">https://nadre.ethernet.edu.et/record/4379/files/Construction Material Management Practices and Its  impact on Project Delivery The Case of Public Building.pdf</subfield>
    <subfield code="z">md5:095bc7c1eb6a4cdc8ff69f074abd2e23</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Mesay Daniel (PhD)</subfield>
    <subfield code="u">ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY</subfield>
    <subfield code="4">ths</subfield>
  </datafield>
  <datafield tag="542" ind1=" " ind2=" ">
    <subfield code="l">open</subfield>
  </datafield>
  <datafield tag="540" ind1=" " ind2=" ">
    <subfield code="u">http://www.opendefinition.org/licenses/cc-by</subfield>
    <subfield code="a">Creative Commons Attribution</subfield>
  </datafield>
  <datafield tag="502" ind1=" " ind2=" ">
    <subfield code="c">ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY</subfield>
  </datafield>
  <datafield tag="650" ind1="1" ind2="7">
    <subfield code="a">cc-by</subfield>
    <subfield code="2">opendefinition.org</subfield>
  </datafield>
  <datafield tag="041" ind1=" " ind2=" ">
    <subfield code="a">eng</subfield>
  </datafield>
  <datafield tag="773" ind1=" " ind2=" ">
    <subfield code="a">10.20372/nadre/4378</subfield>
    <subfield code="i">isVersionOf</subfield>
    <subfield code="n">doi</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-aastu</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">user-nadre</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">Ermias Birke</subfield>
    <subfield code="u">ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY</subfield>
  </datafield>
  <datafield tag="980" ind1=" " ind2=" ">
    <subfield code="a">publication</subfield>
    <subfield code="b">thesis</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="c">2019-10-25</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Construction Material Management Practices and Its impact on Project Delivery: The Case of Public Building Projects in Addis Ababa (Develop Pertinent Software)</subfield>
  </datafield>
  <controlfield tag="005">20191204172433.0</controlfield>
</record>
40
15
views
downloads
All versions This version
Views 4040
Downloads 1515
Data volume 32.7 MB32.7 MB
Unique views 2323
Unique downloads 1313

Share

Cite as